Group-automated operation controls two or even more cars as a group, preserving them timed to work in a specified running interval. Team-computerized operation is utilized if targeted traffic is heavy and two or more elevators are functioning as in hospitals, department shops, and places of work. Droughts & Soil Shrinkage: In droughts, the soils